And here is the picture I've been waiting a few months to take:
That is where everything was kept for working on the bathroom; from 600 pounds of marble, to tools, to bags of thinset and grout, parts, you name it.
It's all gone because I'm all done.
Now I have to get that old bookshelf out, hang the TV on its wall mount properly and that will be that.
It's still dusty and needs a good cleaning, bit I'm pretty happy with how it turned out. Here's the new bronze faucets and base drains, towel rods and dimmable light fixture installed. Even redid all the receptacles, GFCI and switches:
All in for the entire bathroom project, $5,730.00.
Now the wife wants to refinish the cabinets. Yeah. That can wait.